Including a Fund Range in a Copied Projection not in Original Projection

Description of Issue

How can I add a fund range that was not in the original projection that was copied?

Context

Define/Start Budget Projection

Fund range exists in a separate projection that was not duplicated

Cause

Fund range was not in original projection that was copied

Resolution

If mastering projection is required or if you want the fund ranges to display:

  1. Click Search
  2. Enter copied/duplicated projection number 
  3. Accept
  4. Update
  5. Enter new fund range(s)
  6. Accept
  7. Master
  8. Accept

In 2019.1 and above the projection cannot be in Posted status if projection is to be mastered