Delivery method reverts after change on Requisition Line Detail





Description of Issue

Changing a Delivery method on a Requisition Line Detail, when the line detail has a contract and commodity, reverts back upon saving the change. Requisition header takes the same change without issue.



Context
  • Munis

  • Purchasing



Cause

This is a Munis defect



Resolution

Please download MUN-427806 from the MIU/Tyler Deploy when available



Additional Information